Sunday, 10 May 2015

Revising work lists

Like with any restoration project, there are times when the schedule of jobs gets changed about. This is one of these times, when some jobs have to be done sooner than you were thinking of doing them. One job especially is the cabin roof covering as this is a major job in it's own right and will take a lot of work to get correct and have the least amount of wasted material when it comes to covering it with epoxy resin and matting.This job is going to be a bit of a headache, but once it is out of the way a number of other jobs on the deck and superstructure can be done and finished off. While at the same time sorting out the hull and bottom so it can be re-launched and have a chance to take up as it as dried out a fair bit over the past couple of years.